Environmental Issues
Public registers
POEO Public Register
Licences, applications and notices search
Penalty notices search
Enforceable undertakings search
Enforceable undertakings media releases
Exemptions and approvals search
Prosecutions or civil proceedings search
Terms of use: POEO public register
Licensing FAQs
List of licences
Unlicensed premises regulated by the EPA
Contaminated land record of notices
About the record of notices
List of notified sites
Tips for searching
Disclaimer
Dangerous goods licences
Pesticide licences
Radiation licences
Home
Public registers
POEO Public Register
Licences, applications and notices search
Non-Compliance detail
Summary
Licence number:
779
Annual Return Start:
01 Jul 2022
Annual Return End:
30 Jun 2023
Date Received:
22 Sep 2023
Licence Condition number
Type of non-compliance
EPA actions
No. of times occurred
L3.8
Exceedance of total suspended solids limit at Monitoring Point 23
EPA action determined as part of scheduled inspection program
1
M2.7
Fault with conductivity probe at Monitoring Point 23 requiring manual sampling of conductivity to be carried out
EPA action determined as part of scheduled inspection program
1
L3.8
Exceedances of the pH limit at Monitoring Point 19
EPA action determined as part of scheduled inspection program
2
E1.3 and clause 22 o
Exceedances of discharge rate at Monitoring Point 23 under special condition E1.3 (17 July 2022 and 16 August 2022) and clause 22 of the POEO (HRSTS) Regulation 2002 (NSW) (16 August 2022) relating to the Hunter River Salinity Trading Scheme.
EPA action determined as part of scheduled inspection program
2
L3.8
Exceedances of the pH limit at Monitoring Point 19
EPA action determined as part of scheduled inspection program
1
Alleged breach of co
Overflow of water from a Lake Liddell Dam Wall Seepage Return Pit towards Bayswater Creek.
EPA action determined as part of scheduled inspection program
1
Alleged breach of co
Release of water from Contaminated Water Treatment Pond due to a breakage in an underground pipeline.
EPA action determined as part of scheduled inspection program
1
Alleged breach of co
Effluent and demineralised water was released from the Demineralised Water Plant.
EPA action determined as part of scheduled inspection program
1
Alleged breach of co
Water leak at the Lake Liddell Pumping Station
EPA action determined as part of scheduled inspection program
1
Potential breach of
Leak of flyash slurry from the Ravensworth flyash plant.
EPA action determined as part of scheduled inspection program
1
L3.8
Exceedances of the pH limit at Monitoring Point 19
EPA action determined as part of scheduled inspection program
1
M2.7
Missed analytes in sampling monitoring Points 27, 28, 29, 30, 31 32, 33, 35, 36, and 37
EPA action determined as part of scheduled inspection program
1